Urgent engineering and delivery part 4/4
Quality control and shipment As a part of every single delivery at Tcomp, it first went to our QA department to be inspected, measured acc. To approved technical drawings.
Quality control and shipment As a part of every single delivery at Tcomp, it first went to our QA department to be inspected, measured acc. To approved technical drawings.
Assembly After all parts were in house, the assembly started, to join bellows, inner sleeve, flanges and other parts according to the customer’s requirements.
Pre-fab After all engineering, drawings were sent to our intern pre-fab workshop, with laser cut and new bending machine etc.
CASE: Tcomp is delivering 2 pcs. special design for T/C exhaust for a turbo charger with custom flanges and inner sleeve.
Rectangular Metal expansion joint manufactured on our new Yangli MB 8 – 250 x 3299 CNC press brake.
In the start of October Tcomp (Mathias L. Sørensen) had the pleasure of attending a vacuum seminar at CERN through their Big Science membership.
Special 3 bellows expansion joint DN125 for air. Also available with 2 bellows.
DN 1800 Tcomp steel expansion joint ready to be packed and sent to the end customer.
Another new customer who was very satisfied after their inspection and check at Tcomp.
Tcomp have just completed another exciting piping project with a short delivery time of pipe system to customer within the green transition. The steel plates were delivered by the customer, and Tcomp has then, in close cooperation with the parent company Tjæreborg Industri,